ProjectFrom March 2014 to April 2015, the entire faces – facing both the street and the yard – of this industrial building in Berlin’s city centre, were cleaned and subsequently treated with crack-bridging concrete restoration systems. Additionally, 2,450 metres of door frames were sealed; metal side-hung windows and door installations were refurbished and the facade mosaics were replaced.