ProjectProfessional touch-up of about 25,000 sqm steel structures of the plant which was assembled in finish coat; the structures were provided with intermediate and top coat with environmentally sound and water-soluble paints. Works were performed the steam generator with downstream electric precipitator and the unit’s flue gas cleaning system.