The new bridge will have a length of 630 metres, two separate superstructures and pylons with a height of up to 45 metres and will be erected by means of the timed shifting procedure and a 4% longitudinal inclination.
The new bridge will have a length of 630 metres, two separate superstructures and pylons with a height of up to 45 metres and will be erected by means of the timed shifting procedure and a 4% longitudinal inclination.