A19 Petersdorf Bridge, Petersdorf
Home
A19 Petersdorf Bridge, Petersdorf
Europa-Center Hotel Essen
1. June 2018
A19 Petersdorf Bridge, Petersdorf
Categories
Bridges
Industrial Painting
Customer
Donges Steeltec GmbH
Project
Treatment of assembly welding seams and all-over top coating of outer surfaces between September 2017 and October 2017.
The Petersdorf Bridge has a length of about 270 m and a coating surface of about 123,600 sqm.